Tips from a Shipwrightvidéo

Building the TotalBoat - Checking for symmetry (Episode 14)

29 septembre 2016 · 7 min · 238K vues

Ce que couvre cette vidéo

Louis Sauzedde and his assistant Andrew are building a wooden skiff, focusing on ensuring the hull remains symmetrical before installing the bottom planking. To verify symmetry, they clamp two pieces of fur across the frame heads and run a center line from the stem to the stern’s outboard aperture. Using a folding rule, they measure the distance from the top of the second plank to the center line at the boat's widest point, confirming an identical 37.5-inch measurement on both the port and starboard sides. To maintain this alignment, they install a diagonal brace from the bottom of a frame on one side to the top of the frame on the

Regarder sur YouTube

Plus de vidéos de Tips from a Shipwright

Building Orca - Ep. 23: Mold FIVEmars 2026Progressive Bevelingfévr. 20261958 Harley Davidson Panhead Motorcycle - For Salefévr. 2026Building Orca - Ep. 22: Lofting Pt. 3 - Full Scale Linesjanv. 2026

De Tips from a Shipwright — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème