Tips from a Shipwrightvídeo

Building the TotalBoat - Checking for symmetry (Episode 14)

29 de setembro de 2016 · 7 min · 238K visualizações

O que este vídeo aborda

Louis Sauzedde and his assistant Andrew are building a wooden skiff, focusing on ensuring the hull remains symmetrical before installing the bottom planking. To verify symmetry, they clamp two pieces of fur across the frame heads and run a center line from the stem to the stern’s outboard aperture. Using a folding rule, they measure the distance from the top of the second plank to the center line at the boat's widest point, confirming an identical 37.5-inch measurement on both the port and starboard sides. To maintain this alignment, they install a diagonal brace from the bottom of a frame on one side to the top of the frame on the

Assistir no YouTube

Mais de Tips from a Shipwright

Building Orca - Ep. 23: Mold FIVEmar. de 2026Progressive Bevelingfev. de 20261958 Harley Davidson Panhead Motorcycle - For Salefev. de 2026Building Orca - Ep. 22: Lofting Pt. 3 - Full Scale Linesjan. de 2026

De Tips from a Shipwright — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema