Tips from a Shipwrightvideo

Building the TotalBoat - Checking for symmetry (Episode 14)

29 settembre 2016 · 7 min · 238K visualizzazioni

Cosa tratta questo video

Louis Sauzedde and his assistant Andrew are building a wooden skiff, focusing on ensuring the hull remains symmetrical before installing the bottom planking. To verify symmetry, they clamp two pieces of fur across the frame heads and run a center line from the stem to the stern’s outboard aperture. Using a folding rule, they measure the distance from the top of the second plank to the center line at the boat's widest point, confirming an identical 37.5-inch measurement on both the port and starboard sides. To maintain this alignment, they install a diagonal brace from the bottom of a frame on one side to the top of the frame on the

Guarda su YouTube

Altro da Tips from a Shipwright

Building Orca - Ep. 23: Mold FIVEmar 2026Progressive Bevelingfeb 20261958 Harley Davidson Panhead Motorcycle - For Salefeb 2026Building Orca - Ep. 22: Lofting Pt. 3 - Full Scale Linesgen 2026

Da Tips from a Shipwright — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema