Sven Yrvindvideo

6 Nov 2024 Fillets to fix side lockers & Bonus

5 de noviembre de 2024 · 14 min · 3K vistas

¿Qué cubre este video?

Urwind applies epoxy fillets to secure side lockers within a cramped boat interior, noting the difficulty of working in tight quarters.0:10 The construction process involves grinding and clamping, with four fillets installed on both the port and starboard sides.2:05

The narrative shifts to historical context regarding boat design and construction philosophy. Urwind recounts building a six-meter double-ender in a basement using cold-molded construction, consisting of three layers of 4 mm wood bonded with phenolic glue.4:34 This vessel featured a fixed keel with 150 kg of lead and unstayed masts.10:02 Following a 45-day passage from Norway to Madeira, Urwind describes a subsequent voyage to Mar del Plata, Argentina, in 1973 with a companion, Janneke.10:57 The account details the challenges of long-distance sailing in small, uninsulated boats, including provisioning issues and the physical toll of extended time at sea.11:33

Ver en YouTube

Más de Sven Yrvind

3 Compartment Interior Arrangement — Below Deck.sep 2026A Dyslexic Yacht Designer.sep 2026Overview – A Clean Slate.sep 2026Ganbaru in the Southern Ocean.sep 2026

De Sven Yrvind — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema