Sven Yrvindvidéo
6 Nov 2024 Fillets to fix side lockers & Bonus
5 novembre 2024 · 14 min · 3K vues
Ce que couvre cette vidéo
Urwind applies epoxy fillets to secure side lockers within a cramped boat interior, noting the difficulty of working in tight quarters.0:10 The construction process involves grinding and clamping, with four fillets installed on both the port and starboard sides.2:05
The narrative shifts to historical context regarding boat design and construction philosophy. Urwind recounts building a six-meter double-ender in a basement using cold-molded construction, consisting of three layers of 4 mm wood bonded with phenolic glue.4:34 This vessel featured a fixed keel with 150 kg of lead and unstayed masts.10:02 Following a 45-day passage from Norway to Madeira, Urwind describes a subsequent voyage to Mar del Plata, Argentina, in 1973 with a companion, Janneke.10:57 The account details the challenges of long-distance sailing in small, uninsulated boats, including provisioning issues and the physical toll of extended time at sea.11:33
Plus de vidéos de Sven Yrvind
De Sven Yrvind — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



