Sven Yrvindvideo

6 Nov 2024 Fillets to fix side lockers & Bonus

November 5, 2024 · 14 min · 3K views

What this video covers

Urwind applies epoxy fillets to secure side lockers within a cramped boat interior, noting the difficulty of working in tight quarters.0:10 The construction process involves grinding and clamping, with four fillets installed on both the port and starboard sides.2:05

The narrative shifts to historical context regarding boat design and construction philosophy. Urwind recounts building a six-meter double-ender in a basement using cold-molded construction, consisting of three layers of 4 mm wood bonded with phenolic glue.4:34 This vessel featured a fixed keel with 150 kg of lead and unstayed masts.10:02 Following a 45-day passage from Norway to Madeira, Urwind describes a subsequent voyage to Mar del Plata, Argentina, in 1973 with a companion, Janneke.10:57 The account details the challenges of long-distance sailing in small, uninsulated boats, including provisioning issues and the physical toll of extended time at sea.11:33

Watch on YouTube

More from Sven Yrvind

3 Compartment Interior Arrangement — Below Deck.Sep 2026A Dyslexic Yacht Designer.Sep 2026Overview – A Clean Slate.Sep 2026Ganbaru in the Southern Ocean.Sep 2026

From Sven Yrvind — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue