Sail Lifevideo

The road back to boat work: A bunker surprise. Ep. 698

4 de octubre de 2026 · 23 min · 95K vistas

¿Qué cubre este video?

A Landall tilt-bed trailer transports a shipping container workshop to a new site for $650, significantly undercutting a $12,000 crane estimate.1:20 The move requires precise maneuvering, including the use of a snatch block to straighten the container on the trailer and the trailer's steerable axles to navigate tight turns.3:19 Following the relocation, a planned maintenance project to reseal the concrete roof of a bunker with Liquid Rubber fails when pressure washing and sanding reveal widespread adhesion issues and trapped moisture.11:24 Instead of reapplying the sealant, the project shifts to constructing a new metal roof.13:55 This involves installing a pressure-treated 2x6 sill plate secured with concrete wedge anchors, shimming the uneven concrete surface to achieve a level base, and framing rafters with a 14-degree ridge angle.14:50 The process highlights the necessity of thorough surface preparation and the frequency of unforeseen structural repairs in DIY projects.

Ver en YouTube

Barcos en este video

Antares Yachts 44Su barco

Más de Sail Life

The road back to boat work: Bunker roof, done! Ep. 699oct 2026BUNKER vs. LASER - xTool MetalFab laser welder and CNC Ep. 697sep 2026The road back to boat work: Bunker Makeover! Ep. 696sep 2026The road back to boat work: The square eagle has landed! Ep. 695sep 2026

De Sail Life — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema