Sail Lifevideo
The road back to boat work: A bunker surprise. Ep. 698
4 ottobre 2026 · 23 min · 95K visualizzazioni
Cosa tratta questo video
A Landall tilt-bed trailer transports a shipping container workshop to a new site for $650, significantly undercutting a $12,000 crane estimate.1:20 The move requires precise maneuvering, including the use of a snatch block to straighten the container on the trailer and the trailer's steerable axles to navigate tight turns.3:19 Following the relocation, a planned maintenance project to reseal the concrete roof of a bunker with Liquid Rubber fails when pressure washing and sanding reveal widespread adhesion issues and trapped moisture.11:24 Instead of reapplying the sealant, the project shifts to constructing a new metal roof.13:55 This involves installing a pressure-treated 2x6 sill plate secured with concrete wedge anchors, shimming the uneven concrete surface to achieve a level base, and framing rafters with a 14-degree ridge angle.14:50 The process highlights the necessity of thorough surface preparation and the frequency of unforeseen structural repairs in DIY projects.
Barche in questo video
Altro da Sail Life
Da Sail Life — guarda la barca, l'equipaggio e ogni video analizzato del canale.
The Sailing Directory Newsletter
Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.



