Sail Lifevidéo

The road back to boat work: A bunker surprise. Ep. 698

4 octobre 2026 · 23 min · 96K vues

Ce que couvre cette vidéo

A Landall tilt-bed trailer transports a shipping container workshop to a new site for $650, significantly undercutting a $12,000 crane estimate.1:20 The move requires precise maneuvering, including the use of a snatch block to straighten the container on the trailer and the trailer's steerable axles to navigate tight turns.3:19 Following the relocation, a planned maintenance project to reseal the concrete roof of a bunker with Liquid Rubber fails when pressure washing and sanding reveal widespread adhesion issues and trapped moisture.11:24 Instead of reapplying the sealant, the project shifts to constructing a new metal roof.13:55 This involves installing a pressure-treated 2x6 sill plate secured with concrete wedge anchors, shimming the uneven concrete surface to achieve a level base, and framing rafters with a 14-degree ridge angle.14:50 The process highlights the necessity of thorough surface preparation and the frequency of unforeseen structural repairs in DIY projects.

Regarder sur YouTube

Bateaux dans cette vidéo

Antares Yachts 44Leur bateau

Plus de vidéos de Sail Life

The road back to boat work: Bunker roof, done! Ep. 699oct. 2026BUNKER vs. LASER - xTool MetalFab laser welder and CNC Ep. 697sept. 2026The road back to boat work: Bunker Makeover! Ep. 696sept. 2026The road back to boat work: The square eagle has landed! Ep. 695sept. 2026

De Sail Life — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème