Sail Lifevídeo

The road back to boat work: A bunker surprise. Ep. 698

4 de outubro de 2026 · 23 min · 95K visualizações

O que este vídeo aborda

A Landall tilt-bed trailer transports a shipping container workshop to a new site for $650, significantly undercutting a $12,000 crane estimate.1:20 The move requires precise maneuvering, including the use of a snatch block to straighten the container on the trailer and the trailer's steerable axles to navigate tight turns.3:19 Following the relocation, a planned maintenance project to reseal the concrete roof of a bunker with Liquid Rubber fails when pressure washing and sanding reveal widespread adhesion issues and trapped moisture.11:24 Instead of reapplying the sealant, the project shifts to constructing a new metal roof.13:55 This involves installing a pressure-treated 2x6 sill plate secured with concrete wedge anchors, shimming the uneven concrete surface to achieve a level base, and framing rafters with a 14-degree ridge angle.14:50 The process highlights the necessity of thorough surface preparation and the frequency of unforeseen structural repairs in DIY projects.

Assistir no YouTube

Barcos neste vídeo

Antares Yachts 44O barco deles

Mais de Sail Life

The road back to boat work: Bunker roof, done! Ep. 699out. de 2026BUNKER vs. LASER - xTool MetalFab laser welder and CNC Ep. 697set. de 2026The road back to boat work: Bunker Makeover! Ep. 696set. de 2026The road back to boat work: The square eagle has landed! Ep. 695set. de 2026

De Sail Life — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema