kentblairlvideo

O'Day Day Sailer II CYANE 20 Apr 20 Pre Mast Raising Checklist

21 de abril de 2020 · 2 min · 8K vistas

¿Qué cubre este video?

Kent Blair prepares a 1971 O'Day Day Sailer II named CYANE for mast stepping by securing the hull to a vehicle to prevent the stern from tipping.0:13 The rigging setup includes a roller furling system attached to a tang positioned between the spinnaker halyard and the jib halyard.0:20 This configuration allows for either a forestay and jib halyard or a roller furling setup.0:36 A control line runs from the lower furling drum to a block on the bow to facilitate tensioning.0:56 During the mast-raising process, the operator stands in the center of the cockpit to lift and steady the mast while pulling the red furling line forward to engage the hinge plate.1:27 Once the mast is stepped, the forward pin is removed to bend the hinge plate, allowing the furler to be connected.1:27 Proper stabilization of the hull and clear routing of the furling line are essential for a solo mast-raising procedure.

Ver en YouTube

Barcos en este video

O'Day DaysailerSu barco

Más de kentblairl

Bahamas Dinghy HENNING Tape Removalsep 2026Nutshell Pram Tiller Repair IIjun 2026Nutshell Pram Tiller Repairjun 2026Bottle Jack Servicingmay 2026

De kentblairl — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema