Sailing Yabávideo

Can we get our boat ready in time? Finishing touches for Christmas in BRAZIL! — Sailing Yabá 237

6 de diciembre de 2024 · 17 min · 45K vistas · Brazil

¿Qué cubre este video?

The crew of Yabá completes the installation of a custom shower box in preparation for guests.1:43 Ben reinforces the shower basin floor with plywood and epoxy to eliminate soft spots, then seals the structure with a glass-like layer of epoxy resin and cabosil.4:53 He installs a 1.5-inch drain hose, securing the connections with hose clamps and sealant to prevent leaks.13:44 MP prepares to finish the interior surfaces with decorative tiles.7:20 To improve comfort while at anchor in a bay with no wind, the crew deploys a spare anchor from the dinghy to the stern.8:03 This maneuver rotates the bow of Yabá to face the incoming side waves, reducing rolling and increasing airflow through the cabin.8:50 The project concludes with the successful fitting of the shower door and the organization of lines using newly installed belaying pins.11:59

Ver en YouTube

Más de Sailing Yabá

Everything Has to be Perfect: Preparing the Rig for Brand New Sails — Sailing Yabásep 2026Our Sails Ripped on Their Last Journey Before a Massive Upgrade! — Sailing Yabásep 2026Flying Across the Caribbean for Yabá’s Biggest Upgrade Yet — Sailing Yabásep 2026Sailing to Rio: Exploring Brazil’s Most Famous City — Sailing Yabáago 2026

De Sailing Yabá — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema