Sailing Yabávideo
Can we get our boat ready in time? Finishing touches for Christmas in BRAZIL! — Sailing Yabá 237
6 dicembre 2024 · 17 min · 45K visualizzazioni · Brazil
Cosa tratta questo video
The crew of Yabá completes the installation of a custom shower box in preparation for guests.1:43 Ben reinforces the shower basin floor with plywood and epoxy to eliminate soft spots, then seals the structure with a glass-like layer of epoxy resin and cabosil.4:53 He installs a 1.5-inch drain hose, securing the connections with hose clamps and sealant to prevent leaks.13:44 MP prepares to finish the interior surfaces with decorative tiles.7:20 To improve comfort while at anchor in a bay with no wind, the crew deploys a spare anchor from the dinghy to the stern.8:03 This maneuver rotates the bow of Yabá to face the incoming side waves, reducing rolling and increasing airflow through the cabin.8:50 The project concludes with the successful fitting of the shower door and the organization of lines using newly installed belaying pins.11:59
Altro da Sailing Yabá
Da Sailing Yabá — guarda la barca, l'equipaggio e ogni video analizzato del canale.
The Sailing Directory Newsletter
Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.



