Sailing Yabávidéo

Can we get our boat ready in time? Finishing touches for Christmas in BRAZIL! — Sailing Yabá 237

6 décembre 2024 · 17 min · 45K vues · Brazil

Ce que couvre cette vidéo

The crew of Yabá completes the installation of a custom shower box in preparation for guests.1:43 Ben reinforces the shower basin floor with plywood and epoxy to eliminate soft spots, then seals the structure with a glass-like layer of epoxy resin and cabosil.4:53 He installs a 1.5-inch drain hose, securing the connections with hose clamps and sealant to prevent leaks.13:44 MP prepares to finish the interior surfaces with decorative tiles.7:20 To improve comfort while at anchor in a bay with no wind, the crew deploys a spare anchor from the dinghy to the stern.8:03 This maneuver rotates the bow of Yabá to face the incoming side waves, reducing rolling and increasing airflow through the cabin.8:50 The project concludes with the successful fitting of the shower door and the organization of lines using newly installed belaying pins.11:59

Regarder sur YouTube

Plus de vidéos de Sailing Yabá

Our Sails Ripped on Their Last Journey Before a Massive Upgrade! — Sailing Yabásept. 2026Flying Across the Caribbean for Yabá’s Biggest Upgrade Yet — Sailing Yabásept. 2026Sailing to Rio: Exploring Brazil’s Most Famous City — Sailing Yabáaoût 2026Sailing to Ilha Grande: Prison Island transformed into Tropical Paradise! — Sailing Yabáaoût 2026

De Sailing Yabá — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème