Sailing Yabávideo

Can we get our boat ready in time? Finishing touches for Christmas in BRAZIL! — Sailing Yabá 237

December 6, 2024 · 17 min · 45K views · Brazil

What this video covers

The crew of Yabá completes the installation of a custom shower box in preparation for guests.1:43 Ben reinforces the shower basin floor with plywood and epoxy to eliminate soft spots, then seals the structure with a glass-like layer of epoxy resin and cabosil.4:53 He installs a 1.5-inch drain hose, securing the connections with hose clamps and sealant to prevent leaks.13:44 MP prepares to finish the interior surfaces with decorative tiles.7:20 To improve comfort while at anchor in a bay with no wind, the crew deploys a spare anchor from the dinghy to the stern.8:03 This maneuver rotates the bow of Yabá to face the incoming side waves, reducing rolling and increasing airflow through the cabin.8:50 The project concludes with the successful fitting of the shower door and the organization of lines using newly installed belaying pins.11:59

Watch on YouTube

More from Sailing Yabá

Our Sails Ripped on Their Last Journey Before a Massive Upgrade! — Sailing YabáSep 2026Flying Across the Caribbean for Yabá’s Biggest Upgrade Yet — Sailing YabáSep 2026Sailing to Rio: Exploring Brazil’s Most Famous City — Sailing YabáAug 2026Sailing to Ilha Grande: Prison Island transformed into Tropical Paradise! — Sailing YabáAug 2026

From Sailing Yabá — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue