sailing.directory
ChaînesBateauxDemanderÀ propos
🇫🇷
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Se connecter
sailing.directory

Un index des chaînes de voile sur YouTube — interrogeable par sujet, navigable par centre d'intérêt. Nouvelles chaînes et nouveaux bateaux, indexés chaque semaine. Sans bruit.

Explorer

ChaînesBateauxRechercheÀ proposSuggérer une chaîne

Créateurs & mentions légales

SoutenirPour les créateursConfidentialitéConditionsDMCA

Ceci n'est pas un conseil de navigation · © 2026

AccueilChaînesBateaux

Plus

RechercheDemanderÀ proposSoutenirPour les créateursSe connecter

Langue

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Mode d'affichage

sailing.directory
ChaînesBateauxDemanderÀ propos
🇫🇷
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Se connecter

Leading the Escapade · vidéo

We TORE Up Our DECK to Install SYNTHETIC TEAK… Ep-212

30 avril 2026 · 17 min · 24K vues · Florida

Regarder sur YouTube

Ce que couvre cette vidéo

Janae and Jason's boat Escapade, a 23-year-old vessel, had original teak decks worn so thin that screws were surfacing through the planks and recaulking was no longer viable.▶ 2:27 The couple had deferred the job for four to five years after purchase because replacement cost ran $20,000–$30,000; the solution was synthetic teak from Permateek, installed by the World Panel Products team.▶ 0:20 Removal took two days using a combination of multi-tools, hand tools, and larger power tools across the cockpit, side decks, and bow.▶ 4:46 A key finding: the underlying deck was dry throughout, with no soft or waterlogged sections — a significant relief that kept the project on schedule.▶ 7:25 Prep work included pulling remaining screws, sanding off old adhesive and caulking, and filling voids with fiberglass filler to create a flat, solid substrate.▶ 8:50 The World Panel Products crew — Leo and Christian — templated each section on site, cut pieces around existing fittings, bonded them with a plastic-scraped adhesive, then fused rubber caulking seams using a welding machine before a final light sand.▶ 15:34 Deck fittings removed before installation included cleats, a bowsprit, D-rings, and a headsail track; items that couldn't be removed were worked around.▶ 3:37 Synthetic teak requires no oiling or sanding back and can be spot-sanded if stained.▶ 1:16

Plus de vidéos de Leading the Escapade

Ignoring This Boat Upgrade Could Cost You Everything | TruDesign Install! Ep-229juil. 2026The Haul Out That Changed Everything...Ep 228!juin 2026🌴 The Last Paradise Before the Pacific Crossing | San Blas Islands! Ep-227juin 2026LAND at Last - Arriving in COLOMBIA After a WILD Passage | Day 15 (Ep 226)mai 2026

De Leading the Escapade — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

Signaler un problème
AccueilChaînesBateaux

Plus

RechercheDemanderÀ proposSoutenirPour les créateursSe connecter

Langue

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Mode d'affichage

sailing.directory

Un index des chaînes de voile sur YouTube — interrogeable par sujet, navigable par centre d'intérêt. Nouvelles chaînes et nouveaux bateaux, indexés chaque semaine. Sans bruit.

Explorer

ChaînesBateauxRechercheÀ proposSuggérer une chaîne

Créateurs & mentions légales

SoutenirPour les créateursConfidentialitéConditionsDMCA

Ceci n'est pas un conseil de navigation · © 2026