sailing.directory
ChannelsBoatsAskAbout
🇬🇧
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Sign in
sailing.directory

An index of sailing channels on YouTube — searchable by topic, navigable by interest. New channels and boats, indexed weekly. No noise.

Explore

ChannelsBoatsSearchAboutSuggest a channel

Creators & legal

SupportFor creatorsPrivacyTermsDMCA

Not navigation advice · © 2026

HomeChannelsBoats

More

SearchAskAboutSupportFor creatorsSign in

Language

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Display mode

sailing.directory
ChannelsBoatsAskAbout
🇬🇧
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Sign in

Leading the Escapade · video

We TORE Up Our DECK to Install SYNTHETIC TEAK… Ep-212

30 April 2026 · 17 min · 24K views · Florida

Watch on YouTube

What this video covers

Janae and Jason's boat Escapade, a 23-year-old vessel, had original teak decks worn so thin that screws were surfacing through the planks and recaulking was no longer viable.▶ 2:27 The couple had deferred the job for four to five years after purchase because replacement cost ran $20,000–$30,000; the solution was synthetic teak from Permateek, installed by the World Panel Products team.▶ 0:20 Removal took two days using a combination of multi-tools, hand tools, and larger power tools across the cockpit, side decks, and bow.▶ 4:46 A key finding: the underlying deck was dry throughout, with no soft or waterlogged sections — a significant relief that kept the project on schedule.▶ 7:25 Prep work included pulling remaining screws, sanding off old adhesive and caulking, and filling voids with fiberglass filler to create a flat, solid substrate.▶ 8:50 The World Panel Products crew — Leo and Christian — templated each section on site, cut pieces around existing fittings, bonded them with a plastic-scraped adhesive, then fused rubber caulking seams using a welding machine before a final light sand.▶ 15:34 Deck fittings removed before installation included cleats, a bowsprit, D-rings, and a headsail track; items that couldn't be removed were worked around.▶ 3:37 Synthetic teak requires no oiling or sanding back and can be spot-sanded if stained.▶ 1:16

More from Leading the Escapade

Ignoring This Boat Upgrade Could Cost You Everything | TruDesign Install! Ep-229Jul 2026The Haul Out That Changed Everything...Ep 228!Jun 2026🌴 The Last Paradise Before the Pacific Crossing | San Blas Islands! Ep-227Jun 2026LAND at Last - Arriving in COLOMBIA After a WILD Passage | Day 15 (Ep 226)May 2026

From Leading the Escapade — see the channel’s boat, crew, and every analysed video.

Report an issue
HomeChannelsBoats

More

SearchAskAboutSupportFor creatorsSign in

Language

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Display mode

sailing.directory

An index of sailing channels on YouTube — searchable by topic, navigable by interest. New channels and boats, indexed weekly. No noise.

Explore

ChannelsBoatsSearchAboutSuggest a channel

Creators & legal

SupportFor creatorsPrivacyTermsDMCA

Not navigation advice · © 2026