Sailing Squibvidéo
Squib's Refit - Installing the Tank - Painting the Cockpit - Finishing the Cockpit /113
3 avril 2025 · 16 min · 705 vues
Ce que couvre cette vidéo
The crew of the sailboat Squib completes a major cockpit refit, focusing on tank positioning, structural modifications, and final exterior painting. To accommodate a diesel tank, the owner installs a new rudder fitting and verifies clearance for fuel canisters, ensuring the tank does not obstruct the inspection port.0:40 The owner previously raised the cockpit floor by 13 cm using laminated Styrodur to create additional storage space.1:54 The refit includes building a new locker structure and sealing gaps in the rub rails with epoxy to prevent water ingress. Sabina applies multiple coats of paint to the cockpit surfaces, locker lids, and doors, while the owner performs extensive sanding with 400-grit paper and fills surface imperfections with thickened epoxy.3:09 Despite the challenges of dust management and late-season light, the team finishes the final exterior paint application in early October.12:55 The cockpit floor and lids remain unfinished, with plans to apply a non-slip surface the following year.15:45
Plus de vidéos de Sailing Squib
De Sailing Squib — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



