Plus
Langue
Mode d'affichage
RAN Sailingvidéo
19 septembre 2025 · 18 min · 92K vues · Skåne
Ce que couvre cette vidéo
Johan and Malin construct the cockpit coamings and backrests for their boat, prioritizing structural symmetry between the port and starboard sides.▶ 13:12 The process involves laminating four large fiberglass panels using vacuum bagging, which requires 36 kilograms of glass and 30 kilograms of epoxy.▶ 5:11 Johan laminates two panels per vacuum bag to increase efficiency, utilizing a track saw to cut the straight-edged pieces after lamination.▶ 1:48 After prepping the materials, the team glues the coaming sections and backrest components into position.▶ 13:03 Achieving precise alignment between both sides proves time-consuming, requiring Johan to remove and reposition one panel to correct an angle discrepancy.▶ 16:27 The current build phase leaves the coamings with a boxy profile, with plans to add radii to the exterior edges and install the cockpit seats in a future session.▶ 17:07 The project consumes significant material, including 75 sheets of PTFOAM totaling 225 square meters for use in the deckhouse, transom, and interior components.▶ 11:14
Plus de vidéos de RAN Sailing
De RAN Sailing — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.