Sailing Good, Bad, and Uglyvidéo

WELL THIS WAS A HUGE DISAPPOINTMENT...

6 avril 2025 · 22 min · 209K vues

Ce que couvre cette vidéo

Matt and Kristen construct a small wooden bridge over a drainage ditch on their property using scrap 2x4 and 2x12 lumber.6:31 The project involves framing a box, leveling it, and installing 13 planks to create a stable path for a lawnmower.4:32 To finish the utility building housing their solar battery system, the pair applies a chocolate-colored stain to the interior floor and an adobe-colored stain to the exterior stucco walls.12:38 The initial application of the adobe stain on the exterior stucco results in an uneven, patchy finish due to the underlying texture of the masonry.17:59 To correct the appearance, they decide to apply a coat of paint over the exterior and add a second layer of stain to the interior floor.18:22 The bridge and utility building serve as functional infrastructure to support their off-grid power and laundry setup.

Regarder sur YouTube

Plus de vidéos de Sailing Good, Bad, and Ugly

We Needed a Win and This Wasn’t Itaoût 2026The End Is Finally Nearaoût 2026We've Been Avoiding This and We Can't Anymoreaoût 2026We Were Not Ready For This Outcome!août 2026

De Sailing Good, Bad, and Ugly — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème