Sailing Good, Bad, and Uglyvideo

WELL THIS WAS A HUGE DISAPPOINTMENT...

6 April 2025 · 22 min · 209K views

What this video covers

Matt and Kristen construct a small wooden bridge over a drainage ditch on their property using scrap 2x4 and 2x12 lumber.6:31 The project involves framing a box, leveling it, and installing 13 planks to create a stable path for a lawnmower.4:32 To finish the utility building housing their solar battery system, the pair applies a chocolate-colored stain to the interior floor and an adobe-colored stain to the exterior stucco walls.12:38 The initial application of the adobe stain on the exterior stucco results in an uneven, patchy finish due to the underlying texture of the masonry.17:59 To correct the appearance, they decide to apply a coat of paint over the exterior and add a second layer of stain to the interior floor.18:22 The bridge and utility building serve as functional infrastructure to support their off-grid power and laundry setup.

Watch on YouTube

More from Sailing Good, Bad, and Ugly

We Needed a Win and This Wasn’t ItAug 2026The End Is Finally NearAug 2026We've Been Avoiding This and We Can't AnymoreAug 2026We Were Not Ready For This Outcome!Aug 2026

From Sailing Good, Bad, and Ugly — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue