Sailing Squibvidéo

Squib's Refit - Episode 36

5 octobre 2023 · 16 min · 748 vues

Ce que couvre cette vidéo

The refit of the vessel Squib involves multiple structural and electrical upgrades, including the construction of a secondary battery box to facilitate easier charging. The owner builds this temporary box from OSB scraps to house batteries that previously required frequent manual transport.1:12 To optimize space, the owner uses a custom-made probe to measure bilge depth, ensuring the box fits in a 26-centimeter clearance area.0:54 Additional tasks include removing obsolete gas lines, sanding interior walls in the starboard hull, and preparing surfaces for future filler and paint.5:38 The owner also refurbishes two hatch covers by filling holes left by a previous owner’s stern anchor setup, using thickened epoxy to seal the gaps before applying Kiwigrip.10:46 Work is frequently adjusted based on weather conditions, such as avoiding deckhouse sanding when rain is forecast to prevent water ingress.9:01 The project utilizes a Makita random orbital sander, which the owner notes has proven durable throughout the ongoing refit.15:03

Regarder sur YouTube

Plus de vidéos de Sailing Squib

Sailing Squib May 2026 /2août 2026Sailing Squib - Contemporary Witnessjuil. 2026Sailing Squib - May 2026 /1juil. 2026Sailing Squib - We'll take care of the rest on the way - Arrival in Mesolongi/ 33juin 2026

De Sailing Squib — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème