Plus
Langue
Mode d'affichage
Entre Terras e Maresvidéo
28 juin 2026 · 21 min · 325 vues
Ce que couvre cette vidéo
Edgar and Sâmia completed the laminate interior finishing in the bow cabin of their boat, transitioning from dark surfaces to a lighter aesthetic.▶ 4:10 The project involved cutting and bonding laminate sheets to cabin walls, storage doors, and the navigation station.▶ 2:24 To maximize interior brightness, the crew used beige laminate for non-visible storage areas and the base of the bed frame.▶ 8:58 They applied edge banding to exposed sections and installed hardware, including door handles, USB ports, and lighting fixtures.▶ 8:13 The team utilized a flame-retardant, aluminum-backed insulation material called "protelhado" to line the ceiling and provide thermal protection.▶ 17:26 Future plans for the cabin include installing a reflective, mirror-like laminate sheet inside a small vanity table and adding three internal shelves to a storage locker.▶ 18:00 The cabin renovation remains ongoing, with the floor and ceiling panels still requiring final installation.▶ 16:18
Plus de vidéos de Entre Terras e Mares
De Entre Terras e Mares — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.