Sailing Nova Vitavidéo

SAILING Gigha to Campbeltown to Largs

17 novembre 2024 · 15 min · 803 vues · Gigha Island

Ce que couvre cette vidéo

The crew departs Ardmanish Bay on Gigha, navigating around the Mull of Kintyre toward Campbeltown.Watch Initial conditions provide 10 knots of breeze, allowing for full sail, though the crew motors the final stretch as winds drop to 2 knots near the Mull of Kintyre Lighthouse.1:05 The vessel passes the Sanda Island and Kintyre peninsula, navigating past the Macringan's Point marker and Ardmarnock's Barrels buoy before anchoring in 10 meters of water in Campbeltown.3:22 The anchorage features thick mud and shell holding with ample swinging room outside the small craft moorings.8:48 Departing Campbeltown the following morning, the crew sails north toward Largs.8:36 Conditions include 10 to 13 knots of wind, providing a steady sail past Pladda Lighthouse and the Cumbrae Islands.10:27 Despite overcast skies and drizzle, the passage remains straightforward with favorable tides.12:36 The crew arrives at Largs Yacht Haven by late afternoon.14:52

Regarder sur YouTube

Bateaux dans cette vidéo

Bavaria Yachts 36Leur bateau

Plus de vidéos de Sailing Nova Vita

Binnacle electrics repair - WAGO Connectorssept. 2026MD2030 Saildrive bellows installation on Bavariasept. 2026Azores to UK 2026 : Pt 3 : ARRIVAL in PLMYOUTHaoût 2026MD2030 Damper plate repairaoût 2026

De Sailing Nova Vita — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème