Sailing Magic Carpetvidéo
Finally Fixed: This ONE THING Started a 4 Year Refit.
12 janvier 2024 · 22 min · 86K vues · Canada
Ce que couvre cette vidéo
The owners of a Cape George Cutter 36 are rebuilding the vessel's bulwarks to eliminate chronic water ingress points that previously damaged structural deck beams and blocks. The refit replaces original wood construction with foam-core bulwarks, which are fully encapsulated in fiberglass. To prevent future leaks at scupper penetrations, the process involves drilling and hollowing out the bulwarks, then applying multiple layers of fiberglass to the interior perimeter before wrapping the entire structure. Custom bronze chain plates from Port Townsend Foundry were installed with specific hole spacing to avoid deck-level penetrations near the beam shelf. To prevent foam compression during through-bolting, the crew filled drilled holes with high-density epoxy filler using a needle-injection technique. After completing the fiberglass work on the bulwarks and transom, the next steps include fairing, priming, and painting the surfaces before installing the teak toe rail.11:30
Bateaux dans cette vidéo
Plus de vidéos de Sailing Magic Carpet
De Sailing Magic Carpet — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



