Sailing Squibvidéo

Squib's Refit - Episode 20

13 avril 2023 · 23 min · 839 vues

Ce que couvre cette vidéo

The refit of the pocket catamaran Squib involves fabricating and installing a new cabin door and a rear bulkhead panel located behind the helm seat.0:51 The project utilizes reclaimed pine wood from a previous deckhouse build, reinforced with fiberglass matting and thickened epoxy resin.0:40 After laminating the panels, the process requires multiple rounds of filling, sanding with 80-grit paper, and edge-rounding using a small router to achieve a smooth finish.10:17 The builder marks imperfections with a pencil before applying filler to ensure thorough coverage.16:31 Two 10 mm safety glass windows are installed into the prepared cutouts using Sikaflex adhesive, with surfaces cleaned by acetone and stainless steel wool to ensure proper bonding.19:46 The installation also includes measuring and replacing a temporary wooden support with a custom-fabricated metal pipe.7:58 Final mounting of the door and bulkhead occurs during a mild winter weather window, confirming the fit and alignment of the new components.18:58

Regarder sur YouTube

Plus de vidéos de Sailing Squib

Sailing Squib May 2026 /2août 2026Sailing Squib - Contemporary Witnessjuil. 2026Sailing Squib - May 2026 /1juil. 2026Sailing Squib - We'll take care of the rest on the way - Arrival in Mesolongi/ 33juin 2026

De Sailing Squib — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème