Sailing Umavidéo

Our Sailboat is Now Rain-Proof | Step 393

31 mai 2024 · 20 min · 118K vues

Ce que couvre cette vidéo

To seal the V-berth hatch on the sailboat Uma, the crew uses a plywood template and fiberglass to patch the cabin top.1:14 After struggling with wind and heat during previous attempts, the team secures a 4mm plywood backing from underneath using screws to ensure a tight fit against the hull’s compound curves.7:55 They apply multiple layers of chop strand mat and resin from the outside to fill the gap, using plastic sheeting to create a smooth finish.4:20 The crew notes that the resin remains tacky under the plastic until fully cured, but the resulting contour matches the deck profile, requiring only minor fairing.3:36 By sealing the V-berth hatch, the deck is now fully watertight.19:13 Future work includes adding balsa core to the cabin sides and glassing the underside of the deck to increase structural stiffness.17:39 The crew plans to delay cutting new holes for hatches until they have the replacement units on hand.18:57

Regarder sur YouTube

Plus de vidéos de Sailing Uma

We Ditched Our Steering Wheel (And Built Something Better) | Step 496sept. 2026We're Finally Setting Sail Again!sept. 20264 Hours to Rig Solar for an 8-Month Solo Circumnavigationsept. 2026Solar Sponsor Backed Out Before Sailing Around the World !sept. 2026

De Sailing Uma — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème