Sailing Squibvidéo

Squib's Refit - Episode 14

2 mars 2023 · 23 min · 1K vues

Ce que couvre cette vidéo

Peter refits the cabin entrance of the pocket catamaran Squib by fabricating new wooden side panels to replace the aging structure.0:47 He cuts two-meter-long softwood boards to match the seven-degree angle of the deckhouse, accounting for non-parallel cabin walls that vary in width by four centimeters from floor to ceiling.1:21 After dry-fitting the panels, he removes them to apply epoxy and fiberglass reinforcement off-site.5:42 He uses a custom-cut plastic scraper to form a structural fillet, or *Hohlkehle*, between the panels and the fiberglass, allowing him to combine the fillet and lamination steps to save time during the final warm days of the season.16:58 He reinforces the soft wood with generous amounts of epoxy resin to ensure proper saturation and adhesion of the glass matting.13:18 The process involves repeated sanding, filling, and shaping to achieve a smooth finish before final installation. Precise measurement and the use of right-angle jigs prove essential for correcting the irregular geometry of the existing cabin structure.7:12

Regarder sur YouTube

Plus de vidéos de Sailing Squib

Sailing Squib May 2026 /2août 2026Sailing Squib - Contemporary Witnessjuil. 2026Sailing Squib - May 2026 /1juil. 2026Sailing Squib - We'll take care of the rest on the way - Arrival in Mesolongi/ 33juin 2026

De Sailing Squib — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème