Project Brupegvidéo
Genset Mounts & when plans turn to S#-*T! - Project Brupeg Ep. 355
12 mai 2024 · 39 min · 29K vues
Ce que couvre cette vidéo
Fabricating custom steel mounts for a generator installation requires precise alignment and structural reinforcement to ensure the unit remains secure under load. The project involves replacing original crossmembers with 100mm by 16mm flat bar, which is drilled and tapped to accept the generator's rubber engine mounts.9:43 When drilling and tapping steel, using the correct drill bit size is critical; attempting to force a tap into an undersized hole results in damaged threads and requires re-drilling.12:04 To strengthen the mounts, 10mm-thick gussets are welded into the corners of the steel assembly.19:52 TIG welding is preferred in the engine room to minimize splatter, though high heat can cause tungsten electrodes to bend if not managed properly.29:46 When forced to relocate to a "no-work" berth on short notice, the crew must prioritize bolting down the generator and sealing the deck opening to maintain the project timeline.21:17 Proper preparation, including the use of drilling templates and radius-grinding sharp edges, prevents structural failure and injury.3:52
Plus de vidéos de Project Brupeg
De Project Brupeg — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



