Sailing Yabávidéo
Welcome to everyday life of our wooden boat rebuild project — Sailing Yabá 185
31 janvier 2024 · 17 min · 68K vues
Ce que couvre cette vidéo
The crew of the wooden boat Yabá performs final hull and electrical preparations at a shipyard in Brazil. Work centers on sealing the sacrificial keel with epoxy primer and paint, a process delayed by a temporary shortage of catalyst.2:14 The team also epoxies 12 chain plate holes and the transducer mounting point to ensure watertight integrity.7:53 Electrical installation includes routing shore power cables to the MultiPlus inverter-charger and configuring the battery monitoring system via a shunt to track state-of-charge and voltage.1:10 The 24-volt battery bank, consisting of two 13-volt units in series, is tested for amperage draw.11:10 Additional tasks include grinding and polishing stainless steel lug screws for the chain plates.9:06 The crew plans to apply a second coat of epoxy paint to the keel after a six-hour cure time, followed by the installation of the transducer and chain plates.13:35
Plus de vidéos de Sailing Yabá
De Sailing Yabá — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



