Sailing Yabávideo
Welcome to everyday life of our wooden boat rebuild project — Sailing Yabá 185
31 January 2024 · 17 min · 68K views
What this video covers
The crew of the wooden boat Yabá performs final hull and electrical preparations at a shipyard in Brazil. Work centers on sealing the sacrificial keel with epoxy primer and paint, a process delayed by a temporary shortage of catalyst.2:14 The team also epoxies 12 chain plate holes and the transducer mounting point to ensure watertight integrity.7:53 Electrical installation includes routing shore power cables to the MultiPlus inverter-charger and configuring the battery monitoring system via a shunt to track state-of-charge and voltage.1:10 The 24-volt battery bank, consisting of two 13-volt units in series, is tested for amperage draw.11:10 Additional tasks include grinding and polishing stainless steel lug screws for the chain plates.9:06 The crew plans to apply a second coat of epoxy paint to the keel after a six-hour cure time, followed by the installation of the transducer and chain plates.13:35
More from Sailing Yabá
From Sailing Yabá — see the channel’s boat, crew, and every analysed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



