Replacing the MOST IMPORTANT PART of a SAILBOAT! Ep 355
11 mai 2024 · 15 min · 32K vues · Phuket Boat Lagoon
Ce que couvre cette vidéo
The crew of Nandji - Frothlyfe hauls their cutter-rigged sloop at Phuket Boat Lagoon to replace the standing rigging, which is 15 years old and exceeds the recommended 10-year service life.1:18 After using a crane to unstep the mast, the crew identifies significant surface rust on the upper sections of the cables and evidence of previous, inconsistent repairs by former owners.6:00 They replace the existing mix of 1x19 316 stainless steel wire and older compact strand wire with new Hammer Pro compact strand rigging manufactured by Arcus Wire Group.3:06 During the mast-down inspection, the crew discovers chafe damage to the aluminum mast at the halyard exits and installs nylon chafe preventers to protect the metal.11:54 They also replace a disintegrated masthead tri-color light and clean the spreader attachments to inspect for corrosion.12:29 The project concludes with the installation of the new rigging, providing a verified, uniform rig for future offshore passages.15:32 Accurate pin-to-pin measurements of the old cables are essential for ensuring the new rigging fits correctly.6:51
Bateaux dans cette vidéo
Plus de vidéos de Sailing Nandji - Frothlyfe
De Sailing Nandji - Frothlyfe — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



