Replacing the MOST IMPORTANT PART of a SAILBOAT! Ep 355
11 de maio de 2024 · 15 min · 32K visualizações · Phuket Boat Lagoon
O que este vídeo aborda
The crew of Nandji - Frothlyfe hauls their cutter-rigged sloop at Phuket Boat Lagoon to replace the standing rigging, which is 15 years old and exceeds the recommended 10-year service life.1:18 After using a crane to unstep the mast, the crew identifies significant surface rust on the upper sections of the cables and evidence of previous, inconsistent repairs by former owners.6:00 They replace the existing mix of 1x19 316 stainless steel wire and older compact strand wire with new Hammer Pro compact strand rigging manufactured by Arcus Wire Group.3:06 During the mast-down inspection, the crew discovers chafe damage to the aluminum mast at the halyard exits and installs nylon chafe preventers to protect the metal.11:54 They also replace a disintegrated masthead tri-color light and clean the spreader attachments to inspect for corrosion.12:29 The project concludes with the installation of the new rigging, providing a verified, uniform rig for future offshore passages.15:32 Accurate pin-to-pin measurements of the old cables are essential for ensuring the new rigging fits correctly.6:51
Barcos neste vídeo
Mais de Sailing Nandji - Frothlyfe
De Sailing Nandji - Frothlyfe — veja o barco, a tripulação e cada vídeo analisado do canal.
The Sailing Directory Newsletter
Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.



