Entre Terras e Maresvidéo
MADNESS! We removed the wood from the boat! S1.ep3
24 octobre 2021 · 15 min · 2K vues · Itupiranga
Ce que couvre cette vidéo
The crew removes rotted interior wood paneling from their boat during a refit project at a reservoir in Brazil.3:41 Exposure to rain caused the non-structural cabinetry and partition wood to decay, necessitating a complete removal and a planned redesign of the interior layout.3:38 While clearing the debris, the team encounters airborne fiberglass dust and wood splinters, prompting the purchase of safety glasses, gloves, and protective masks from a local hardware store.4:27 Subsequent heavy rain and a sudden squall flood the interior, forcing the crew to disconnect electrical tools and secure the vessel to prevent water damage.11:11 They utilize a wet-dry vacuum to remove standing water from the bilge and clean the remaining dust.9:17 The team plans to proceed with sanding the hull interior and deck before beginning the lamination process.14:12
Plus de vidéos de Entre Terras e Mares
De Entre Terras e Mares — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



