Entre Terras e Maresvídeo

MADNESS! We removed the wood from the boat! S1.ep3

24 de outubro de 2021 · 15 min · 2K visualizações · Itupiranga

O que este vídeo aborda

The crew removes rotted interior wood paneling from their boat during a refit project at a reservoir in Brazil.3:41 Exposure to rain caused the non-structural cabinetry and partition wood to decay, necessitating a complete removal and a planned redesign of the interior layout.3:38 While clearing the debris, the team encounters airborne fiberglass dust and wood splinters, prompting the purchase of safety glasses, gloves, and protective masks from a local hardware store.4:27 Subsequent heavy rain and a sudden squall flood the interior, forcing the crew to disconnect electrical tools and secure the vessel to prevent water damage.11:11 They utilize a wet-dry vacuum to remove standing water from the bilge and clean the remaining dust.9:17 The team plans to proceed with sanding the hull interior and deck before beginning the lamination process.14:12

Assistir no YouTube

Mais de Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 183jul. de 2026WE FINISHED the bow cabin LAMINATE ! S1.ep182jun. de 2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 181jun. de 2026This week the focus was on something elsejun. de 2026

De Entre Terras e Mares — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema