Sailing Squibvideo
Squib's Refit - Episode 42
16 novembre 2023 · 16 min · 669 visualizzazioni · Vienna
Cosa tratta questo video
Refitting the pocket catamaran Squib involves removing deck hardware, grinding away damaged gelcoat, and repairing structural stress cracks. The project begins by stripping the safety rails and jib tracks from the deck, though some fasteners require drilling or grinding when nuts are inaccessible or seized.0:47 After clearing the hardware, the crew grinds down areas of degraded gelcoat and removes remnants of old hinge mounts.4:24 Inspection reveals stress cracks at four locations where internal bulkheads meet the deck, likely caused by structural loads near window cutouts.7:23 These cracks are ground out to create a clean surface for reinforcement.8:44 The repair process involves laminating two or three layers of fiberglass mat over the ground-out areas to restore structural integrity.8:52 Once the epoxy cures, the surface is sanded smooth to prepare for final finishing.14:47 Sabina assists by applying the first layer of epoxy to the reinforced sections and painting the interior of the deckhouse.15:33
Altro da Sailing Squib
Da Sailing Squib — guarda la barca, l'equipaggio e ogni video analizzato del canale.
The Sailing Directory Newsletter
Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.



