Sailing Squibvídeo

Squib's Refit - Episode 42

16 de noviembre de 2023 · 16 min · 669 visitas · Vienna

Qué cubre este vídeo

Refitting the pocket catamaran Squib involves removing deck hardware, grinding away damaged gelcoat, and repairing structural stress cracks. The project begins by stripping the safety rails and jib tracks from the deck, though some fasteners require drilling or grinding when nuts are inaccessible or seized.0:47 After clearing the hardware, the crew grinds down areas of degraded gelcoat and removes remnants of old hinge mounts.4:24 Inspection reveals stress cracks at four locations where internal bulkheads meet the deck, likely caused by structural loads near window cutouts.7:23 These cracks are ground out to create a clean surface for reinforcement.8:44 The repair process involves laminating two or three layers of fiberglass mat over the ground-out areas to restore structural integrity.8:52 Once the epoxy cures, the surface is sanded smooth to prepare for final finishing.14:47 Sabina assists by applying the first layer of epoxy to the reinforced sections and painting the interior of the deckhouse.15:33

Ver en YouTube

Más de Sailing Squib

Sailing Squib May 2026 /2ago 2026Sailing Squib - Contemporary Witnessjul 2026Sailing Squib - May 2026 /1jul 2026Sailing Squib - We'll take care of the rest on the way - Arrival in Mesolongi/ 33jun 2026

De Sailing Squib — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema