Sailing Squibvidéo

Squib's Refit - Episode 42

16 novembre 2023 · 16 min · 669 vues · Vienna

Ce que couvre cette vidéo

Refitting the pocket catamaran Squib involves removing deck hardware, grinding away damaged gelcoat, and repairing structural stress cracks. The project begins by stripping the safety rails and jib tracks from the deck, though some fasteners require drilling or grinding when nuts are inaccessible or seized.0:47 After clearing the hardware, the crew grinds down areas of degraded gelcoat and removes remnants of old hinge mounts.4:24 Inspection reveals stress cracks at four locations where internal bulkheads meet the deck, likely caused by structural loads near window cutouts.7:23 These cracks are ground out to create a clean surface for reinforcement.8:44 The repair process involves laminating two or three layers of fiberglass mat over the ground-out areas to restore structural integrity.8:52 Once the epoxy cures, the surface is sanded smooth to prepare for final finishing.14:47 Sabina assists by applying the first layer of epoxy to the reinforced sections and painting the interior of the deckhouse.15:33

Regarder sur YouTube

Plus de vidéos de Sailing Squib

Sailing Squib May 2026 /2août 2026Sailing Squib - Contemporary Witnessjuil. 2026Sailing Squib - May 2026 /1juil. 2026Sailing Squib - We'll take care of the rest on the way - Arrival in Mesolongi/ 33juin 2026

De Sailing Squib — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème