Sailing Magic Carpetvideo

How To Build A Sailboat Rig: Roller Furlers.

23 agosto 2024 · 27 min · 61K visualizzazioni

Cosa tratta questo video

Refitting a Cape George Cutter 36 requires replacing the forestay and staysail stay with new wire and installing roller furling systems.3:39 The project utilizes mechanical Stay-Loc fittings rather than swaged terminals, allowing for field inspection and repair without specialized hydraulic swaging equipment.4:37 The process involves measuring the existing pin-to-pin length, unlaying the wire strands to seat the cone, and securing the fitting with marine-grade silicone and red Loctite.5:06 Aluminum foils are then cut to length to encase the wire, providing an aerodynamic profile and a track for the sail.15:34 Because mechanical fittings do not pass through the foil extrusions, the foils must be loaded onto the wire before the final bottom fitting is attached at the boat.14:11 Maintenance for the Italian-made Balmar furling units consists of regular fresh water rinsing and applying Tef-Gel or Lanocote to fasteners to prevent corrosion and ensure future disassembly.22:42 Proper articulation is achieved by installing toggles at both the top and bottom of the stay.12:25

Guarda su YouTube

Barche in questo video

Cape GEORGE 38La loro barca

Altro da Sailing Magic Carpet

Sailing Northern Canada | Alone and at Peaceset 2026Sailing Northern Canada | Alone on a Long Summers Dayset 2026Sailing Northern Canada | Fishing, Beachcombing.ago 2026Suddenly, The Boat Wasn't Where We Left It [Ep 3]ago 2026

Da Sailing Magic Carpet — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema