Sailing Magic Carpetvidéo

How To Build A Sailboat Rig: Roller Furlers.

23 août 2024 · 27 min · 61K vues

Ce que couvre cette vidéo

Refitting a Cape George Cutter 36 requires replacing the forestay and staysail stay with new wire and installing roller furling systems.3:39 The project utilizes mechanical Stay-Loc fittings rather than swaged terminals, allowing for field inspection and repair without specialized hydraulic swaging equipment.4:37 The process involves measuring the existing pin-to-pin length, unlaying the wire strands to seat the cone, and securing the fitting with marine-grade silicone and red Loctite.5:06 Aluminum foils are then cut to length to encase the wire, providing an aerodynamic profile and a track for the sail.15:34 Because mechanical fittings do not pass through the foil extrusions, the foils must be loaded onto the wire before the final bottom fitting is attached at the boat.14:11 Maintenance for the Italian-made Balmar furling units consists of regular fresh water rinsing and applying Tef-Gel or Lanocote to fasteners to prevent corrosion and ensure future disassembly.22:42 Proper articulation is achieved by installing toggles at both the top and bottom of the stay.12:25

Regarder sur YouTube

Bateaux dans cette vidéo

Cape GEORGE 38Leur bateau

Plus de vidéos de Sailing Magic Carpet

Sailing Northern Canada | Alone and at Peacesept. 2026Sailing Northern Canada | Alone on a Long Summers Daysept. 2026Sailing Northern Canada | Fishing, Beachcombing.août 2026Suddenly, The Boat Wasn't Where We Left It [Ep 3]août 2026

De Sailing Magic Carpet — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème