Sailing Magic Carpetvideo

How To Build A Sailboat Rig: Roller Furlers.

August 23, 2024 · 27 min · 61K views

What this video covers

Refitting a Cape George Cutter 36 requires replacing the forestay and staysail stay with new wire and installing roller furling systems.3:39 The project utilizes mechanical Stay-Loc fittings rather than swaged terminals, allowing for field inspection and repair without specialized hydraulic swaging equipment.4:37 The process involves measuring the existing pin-to-pin length, unlaying the wire strands to seat the cone, and securing the fitting with marine-grade silicone and red Loctite.5:06 Aluminum foils are then cut to length to encase the wire, providing an aerodynamic profile and a track for the sail.15:34 Because mechanical fittings do not pass through the foil extrusions, the foils must be loaded onto the wire before the final bottom fitting is attached at the boat.14:11 Maintenance for the Italian-made Balmar furling units consists of regular fresh water rinsing and applying Tef-Gel or Lanocote to fasteners to prevent corrosion and ensure future disassembly.22:42 Proper articulation is achieved by installing toggles at both the top and bottom of the stay.12:25

Watch on YouTube

Boats in this video

Cape GEORGE 38Their boat

More from Sailing Magic Carpet

Sailing Northern Canada | Alone and at PeaceSep 2026Sailing Northern Canada | Alone on a Long Summers DaySep 2026Sailing Northern Canada | Fishing, Beachcombing.Aug 2026Suddenly, The Boat Wasn't Where We Left It [Ep 3]Aug 2026

From Sailing Magic Carpet — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue