Sven Yrvindvideo

6 Nov 2024 Fillets to fix side lockers & Bonus

5 novembre 2024 · 14 min · 3K visualizzazioni

Cosa tratta questo video

Urwind applies epoxy fillets to secure side lockers within a cramped boat interior, noting the difficulty of working in tight quarters.0:10 The construction process involves grinding and clamping, with four fillets installed on both the port and starboard sides.2:05

The narrative shifts to historical context regarding boat design and construction philosophy. Urwind recounts building a six-meter double-ender in a basement using cold-molded construction, consisting of three layers of 4 mm wood bonded with phenolic glue.4:34 This vessel featured a fixed keel with 150 kg of lead and unstayed masts.10:02 Following a 45-day passage from Norway to Madeira, Urwind describes a subsequent voyage to Mar del Plata, Argentina, in 1973 with a companion, Janneke.10:57 The account details the challenges of long-distance sailing in small, uninsulated boats, including provisioning issues and the physical toll of extended time at sea.11:33

Guarda su YouTube

Altro da Sven Yrvind

The First Molds Are Up.ott 2026Bending the Bottom a Bit.ott 2026NM Epoxy and Mold Base.ott 2026Two 5 8 meter aluminum profiles for the mold base.ott 2026

Da Sven Yrvind — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema