Project Brupegvideo

Aligning the propeller shaft and gearbox - Project Brupeg Ep.319

3 settembre 2023 · 56 min · 72K visualizzazioni

Cosa tratta questo video

The restoration of the fishing trawler *Brupeg* requires precise alignment between the propeller shaft and the gearbox output flange. To establish a baseline, the crew centers the propeller shaft within its stern gland bearings by measuring total vertical movement with a dial gauge and lifting the shaft to the midpoint of that travel.26:07 With the shaft centered, they use a chain block and jacking screws on the engine mounts to shift the engine assembly into position.23:13 Because space constraints prevent a full 360-degree rotation of the shaft for dial indicator measurements, the team uses feeler gauges to ensure the gearbox and propeller shaft flanges are parallel and face-to-face.25:29 They then plan to use a modified, low-profile dial gauge base to achieve final center-to-center alignment.30:19 The process involves iterative adjustments between the engine mounts and the shaft position to ensure the drivetrain is perfectly mated.

Guarda su YouTube

Altro da Project Brupeg

Was the outboard rebuild worth it and Brupeg has developed a worrying noise... Project Brupeg Ep.456ago 2026Three Builds, One Croc Sanctuary: Boat Life on Brupeg - Project Brupeg Ep.455ago 2026Brupeg's 1st Drone, Green Island & Boatwork - Project Brupeg Ep.454lug 2026Good Mates & Boat Maintenance - Project Brupeg Ep.453lug 2026

Da Project Brupeg — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema