Project Brupegvideo
Aligning the propeller shaft and gearbox - Project Brupeg Ep.319
3 September 2023 · 56 min · 72K views
What this video covers
The restoration of the fishing trawler *Brupeg* requires precise alignment between the propeller shaft and the gearbox output flange. To establish a baseline, the crew centers the propeller shaft within its stern gland bearings by measuring total vertical movement with a dial gauge and lifting the shaft to the midpoint of that travel.26:07 With the shaft centered, they use a chain block and jacking screws on the engine mounts to shift the engine assembly into position.23:13 Because space constraints prevent a full 360-degree rotation of the shaft for dial indicator measurements, the team uses feeler gauges to ensure the gearbox and propeller shaft flanges are parallel and face-to-face.25:29 They then plan to use a modified, low-profile dial gauge base to achieve final center-to-center alignment.30:19 The process involves iterative adjustments between the engine mounts and the shaft position to ensure the drivetrain is perfectly mated.
More from Project Brupeg
From Project Brupeg — see the channel’s boat, crew, and every analysed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



