Windy_Wayravideo

OUR SHIP IN 3D: REPLACING THE RIGGING OURSELVES⚓💻 | Windy Wayra Ep 68

30. januar 2026 · 10 min · 2K visninger

Hva denne videoen dekker

The owners of an Amel Maramu 46 are preparing to replace their standing rigging by using 3D modeling software to plan structural modifications and ordering custom-terminated wire from SVB.6:24 The current rigging dates to 2006, exceeding the recommended 15-year service life, though a recent inspection of the terminals showed no signs of corrosion.4:17 To minimize costs and ensure accuracy, the crew ordered 1x19 stainless steel wire with one end factory-swaged and the other left for field-installation using mechanical terminals.6:11 This method allows them to measure the old cables against the new ones individually, reducing the risk of measurement errors.7:03 To maintain mast stability during the replacement process, they plan to use a spinnaker halyard tensioned by a winch to temporarily replace the load of each stay.8:08 The project also includes designing custom davits and integrating a Hydrovane windvane steering system.2:32 A professional inspection will follow the installation to satisfy insurance requirements for mast-breakage coverage.5:11

Se på YouTube

Mer fra Windy_Wayra

Welding, angle grinders, and lots of sweat: This is how we made our SOLAR ARCH in Greece | Windy W...juni 2026DAY 1 OF THE REFIT IN GREECE ⏳ WILL WE MAKE IT IN 3 MONTHS? | Windy Wayra Ep 70mai 2026OUR WAYRA WISHLIST: MADNESS OR NECESSITY? | Windy Wayra Ep 70apr. 2026WE VISIT WAYRA, AN INTERNAL DISASTER... ☞ | Windy Wayra Ep 69mars 2026

Fra Windy_Wayra – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem