Windy_Wayravidéo
OUR SHIP IN 3D: REPLACING THE RIGGING OURSELVES⚓💻 | Windy Wayra Ep 68
30 janvier 2026 · 10 min · 2K vues
Ce que couvre cette vidéo
The owners of an Amel Maramu 46 are preparing to replace their standing rigging by using 3D modeling software to plan structural modifications and ordering custom-terminated wire from SVB.6:24 The current rigging dates to 2006, exceeding the recommended 15-year service life, though a recent inspection of the terminals showed no signs of corrosion.4:17 To minimize costs and ensure accuracy, the crew ordered 1x19 stainless steel wire with one end factory-swaged and the other left for field-installation using mechanical terminals.6:11 This method allows them to measure the old cables against the new ones individually, reducing the risk of measurement errors.7:03 To maintain mast stability during the replacement process, they plan to use a spinnaker halyard tensioned by a winch to temporarily replace the load of each stay.8:08 The project also includes designing custom davits and integrating a Hydrovane windvane steering system.2:32 A professional inspection will follow the installation to satisfy insurance requirements for mast-breakage coverage.5:11
Plus de vidéos de Windy_Wayra
De Windy_Wayra — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



