Windy_Wayravídeo

OUR SHIP IN 3D: REPLACING THE RIGGING OURSELVES⚓💻 | Windy Wayra Ep 68

30 de janeiro de 2026 · 10 min · 2K visualizações

O que este vídeo aborda

The owners of an Amel Maramu 46 are preparing to replace their standing rigging by using 3D modeling software to plan structural modifications and ordering custom-terminated wire from SVB.6:24 The current rigging dates to 2006, exceeding the recommended 15-year service life, though a recent inspection of the terminals showed no signs of corrosion.4:17 To minimize costs and ensure accuracy, the crew ordered 1x19 stainless steel wire with one end factory-swaged and the other left for field-installation using mechanical terminals.6:11 This method allows them to measure the old cables against the new ones individually, reducing the risk of measurement errors.7:03 To maintain mast stability during the replacement process, they plan to use a spinnaker halyard tensioned by a winch to temporarily replace the load of each stay.8:08 The project also includes designing custom davits and integrating a Hydrovane windvane steering system.2:32 A professional inspection will follow the installation to satisfy insurance requirements for mast-breakage coverage.5:11

Ver no YouTube

Mais de Windy_Wayra

Welding, angle grinders, and lots of sweat: This is how we made our SOLAR ARCH in Greece | Windy W...06/2026DAY 1 OF THE REFIT IN GREECE ⏳ WILL WE MAKE IT IN 3 MONTHS? | Windy Wayra Ep 7005/2026OUR WAYRA WISHLIST: MADNESS OR NECESSITY? | Windy Wayra Ep 7004/2026WE VISIT WAYRA, AN INTERNAL DISASTER... ☞ | Windy Wayra Ep 6903/2026

De Windy_Wayra — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema