Windy_Wayravideo
OUR SHIP IN 3D: REPLACING THE RIGGING OURSELVES⚓💻 | Windy Wayra Ep 68
30 gennaio 2026 · 10 min · 2K visualizzazioni
Cosa tratta questo video
The owners of an Amel Maramu 46 are preparing to replace their standing rigging by using 3D modeling software to plan structural modifications and ordering custom-terminated wire from SVB.6:24 The current rigging dates to 2006, exceeding the recommended 15-year service life, though a recent inspection of the terminals showed no signs of corrosion.4:17 To minimize costs and ensure accuracy, the crew ordered 1x19 stainless steel wire with one end factory-swaged and the other left for field-installation using mechanical terminals.6:11 This method allows them to measure the old cables against the new ones individually, reducing the risk of measurement errors.7:03 To maintain mast stability during the replacement process, they plan to use a spinnaker halyard tensioned by a winch to temporarily replace the load of each stay.8:08 The project also includes designing custom davits and integrating a Hydrovane windvane steering system.2:32 A professional inspection will follow the installation to satisfy insurance requirements for mast-breakage coverage.5:11
Altro da Windy_Wayra
Da Windy_Wayra — guarda la barca, l'equipaggio e ogni video analizzato del canale.
The Sailing Directory Newsletter
Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.



