Windy_Wayravideo

OUR SHIP IN 3D: REPLACING THE RIGGING OURSELVES⚓💻 | Windy Wayra Ep 68

30 gennaio 2026 · 10 min · 2K visualizzazioni

Cosa tratta questo video

The owners of an Amel Maramu 46 are preparing to replace their standing rigging by using 3D modeling software to plan structural modifications and ordering custom-terminated wire from SVB.6:24 The current rigging dates to 2006, exceeding the recommended 15-year service life, though a recent inspection of the terminals showed no signs of corrosion.4:17 To minimize costs and ensure accuracy, the crew ordered 1x19 stainless steel wire with one end factory-swaged and the other left for field-installation using mechanical terminals.6:11 This method allows them to measure the old cables against the new ones individually, reducing the risk of measurement errors.7:03 To maintain mast stability during the replacement process, they plan to use a spinnaker halyard tensioned by a winch to temporarily replace the load of each stay.8:08 The project also includes designing custom davits and integrating a Hydrovane windvane steering system.2:32 A professional inspection will follow the installation to satisfy insurance requirements for mast-breakage coverage.5:11

Guarda su YouTube

Altro da Windy_Wayra

Welding, angle grinders, and lots of sweat: This is how we made our SOLAR ARCH in Greece | Windy W...giu 2026DAY 1 OF THE REFIT IN GREECE ⏳ WILL WE MAKE IT IN 3 MONTHS? | Windy Wayra Ep 70mag 2026OUR WAYRA WISHLIST: MADNESS OR NECESSITY? | Windy Wayra Ep 70apr 2026WE VISIT WAYRA, AN INTERNAL DISASTER... ☞ | Windy Wayra Ep 69mar 2026

Da Windy_Wayra — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema