RAN Sailingvideo

Port Side Toe Rail & Deckhouse Carbon Corners - Ep. 494 Ran Sailing

3. juli 2026 · 20 min · 89K visninger · Skåne

Hva denne videoen dekker

Laminating a continuous toe rail on a 52-foot boat requires careful planning during high-temperature conditions to manage epoxy cure times and vacuum bagging schedules.2:04 When ambient temperatures reach 30 degrees Celsius, rapid epoxy curing makes vacuum bagging large sections difficult, prompting a shift to smaller tabbing tasks that do not require vacuum pressure.1:55 Using unidirectional carbon fiber without a carrier thread simplifies saturation for small components, though it may fray more easily than standard materials.0:25 Omitting peel ply during lamination leads to amine blush, an oily surface film that prevents proper secondary bonding.8:07 Removing this residue requires washing the surface with hot water and a sponge, followed by thorough sanding to restore mechanical tooth.9:43 To manage deck drainage without scuppers in the toe rail, the design incorporates deck drains that exit above the waterline, a system previously used on a Nyad 440.18:09

Se på YouTube

Mer fra RAN Sailing

This Is Where Boat Builds Break People - Ep. 501 Ran Sailingaug. 2026Our 52ft Sailboat Build Reaches Another Milestone! - Ep. 500 Ran Sailingaug. 2026How Many Hatches Does a 52ft Sailboat Need? - Ep. 499 Ran Sailingaug. 2026Making Our Sailboat One Solid Structure - Ep. 498 Ran Sailingaug. 2026

Fra RAN Sailing – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem