RAN Sailingvideo

Port Side Toe Rail & Deckhouse Carbon Corners - Ep. 494 Ran Sailing

3 de julio de 2026 · 20 min · 91K vistas · Skåne

¿Qué cubre este video?

Laminating a continuous toe rail on a 52-foot boat requires careful planning during high-temperature conditions to manage epoxy cure times and vacuum bagging schedules.2:04 When ambient temperatures reach 30 degrees Celsius, rapid epoxy curing makes vacuum bagging large sections difficult, prompting a shift to smaller tabbing tasks that do not require vacuum pressure.1:55 Using unidirectional carbon fiber without a carrier thread simplifies saturation for small components, though it may fray more easily than standard materials.0:25 Omitting peel ply during lamination leads to amine blush, an oily surface film that prevents proper secondary bonding.8:07 Removing this residue requires washing the surface with hot water and a sponge, followed by thorough sanding to restore mechanical tooth.9:43 To manage deck drainage without scuppers in the toe rail, the design incorporates deck drains that exit above the waterline, a system previously used on a Nyad 440.18:09

Ver en YouTube

Más de RAN Sailing

There's No Manual For This! Building Our Own 52ft Sailboat - Ep. 506 Ran Sailingoct 2026Carbon Pillars & No Dorade Boxes! - Building Our 52ft Sailboat - Ep. 505 Ran Sailingoct 2026Will the Sanding EVER End? Building Our Dreamboat - Ep. 503 Ran Sailingsep 2026Something's Not Right Here! Building Our 52ft Sailboat - Ep. 502sep 2026

De RAN Sailing — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema